Skip to content
RequestRoofA CLEARER WAY HOME
THE PLANNING DESK / 01

One roof.
A clearer plan.

Put the roof, solar and the numbers on the same page.

50 STATES + D.C.

Start with a working example. Replace every assumption with your measurements, utility terms and written quotes.

Explore incentive sources
Unsaved planning draft
Sign in to save
01 / MEASURE

Start with the roof.

A planning label. Changing it does not invent a new price.

Use the roof's horizontal projection, including eaves; not the sum of all interior floors.

6 means a 6:12 pitch. Use one weighted estimate only for a simple roof.

12 in run6 in rise
ROOF SURFACE2,012 ft²

Materials with waste: 2,254 ft²

02 / PRICE

Make the assumptions yours.

The starting rates are illustrative inputs, not local market averages. All amounts are USD.

Applies to materials only. Confirm layout and product waste.

Added to labor only; access, dormers and multiple planes.

Use zero if no tear-off is included.

Optional. Replaces the entire modeled roof package, including contingency.

See the roof line items & formula
Roof materials2,254 ft² including 12% waste × material rate$3,381 – $6,762
Installation labor2,012 ft² roof surface × labor rate$4,025 – $8,050
Access & complexity0% of installation labor$0
Tear-off1 layer(s) × surface area × removal rate$2,012
Decking allowance0 ft² × decking rate; confirm damaged area onsite$0
Roof permit allowanceYour entered allowance$400
Disposal allowanceYour entered allowance$400
Contingency10% of modeled roof subtotal$1,022 – $1,762

Surface = footprint × √(1 + (pitch ÷ 12)²). With measured surface area, pitch is not applied. Material waste and labor complexity are separate. Multiple roof planes require a professional measurement.

REQUESTROOF • PLANNING BRIEF
My roof + energy plan
Location: 
Illustrative planning model. Replace assumptions with written quotes. No automatic incentive or ZIP-based price adjustment.

ROOF GEOMETRY
Input 1800 ft² (footprint); pitch 6/12. Surface 2012.5 ft²; materials 2254.0 ft² including 12% waste.
Roof materials: $3,381 – $6,762 — 2,254 ft² including 12% waste × material rate
Installation labor: $4,025 – $8,050 — 2,012 ft² roof surface × labor rate
Access & complexity: $0 — 0% of installation labor
Tear-off: $2,012 — 1 layer(s) × surface area × removal rate
Decking allowance: $0 — 0 ft² × decking rate; confirm damaged area onsite
Roof permit allowance: $400 — Your entered allowance
Disposal allowance: $400 — Your entered allowance
Contingency: $1,022 – $1,762 — 10% of modeled roof subtotal

ROOF ONLY
Roof installed package: $11,240 – $19,387
Gross: $11,240 – $19,387
Confirmed incentives: $0
Net after confirmed incentives: $11,240 – $19,387
Modeled first-year energy value after maintenance: $0
Payment assumption: cash

ROOF + SOLAR
Roof installed package: $11,240 – $19,387
Solar installed package: $15,000 – $24,000
Confirmed combined-work discount: -$0
Gross: $26,240 – $43,387
Confirmed incentives: $0
Net after confirmed incentives: $26,240 – $43,387
Modeled first-year energy value after maintenance: $554
Payment assumption: cash

ROOF + SOLAR + BATTERY
Roof installed package: $11,240 – $19,387
Solar installed package: $15,000 – $24,000
Battery installed package: $10,000 – $18,000
Confirmed combined-work discount: -$0
Gross: $36,240 – $61,387
Confirmed incentives: $0
Net after confirmed incentives: $36,240 – $61,387
Modeled first-year energy value after maintenance: $554
Payment assumption: cash

INCENTIVES
No incentives confirmed.
ENERGY ASSUMPTIONS
Generation 8000 kWh/year; household use 12000 kWh/year; direct self-use 40%; retail $0.16/kWh; export $0.04/kWh; solar maintenance $150/year. Battery charge 0 kWh/year, efficiency 90%, maintenance $0/year.
Loan model uses gross less cash deposit, not future incentives. Deposit $0; annual interest 7%; term 10 years. Fees, escalation, degradation, replacements and tax effects are not modeled.

SITE REVIEW CHECKLIST
□ Roof life & condition — Record roof age, remaining service life, attachment details and who covers roof penetrations.
□ Shade & production — Request an hourly or annual shade assessment. Include trees, chimneys and seasonal shadows.
□ Direction & usable roof area — Have the installer model each usable roof plane, pitch, setbacks and obstructions. Direction alone does not establish suitability.
□ Structure & attachments — Have a qualified professional verify roof structure, attachment loads and local requirements. Save the review with your roof records.
□ Utility & electrical — Confirm the electrical-panel scope, interconnection process, export rate, fixed charges and permission to operate with the utility.
□ Permission & project coordination — Confirm ownership permissions, applicable HOA/local approvals, installer responsibilities and the roof/solar sequence.

NOTES
None entered.

METHOD
Surface = footprint × √(1 + (rise/12)²), or entered surface area. Waste applies only to materials; complexity applies only to labor. Quote overrides replace their whole package. Annual energy value = onsite kWh × retail rate + export kWh × export rate − maintenance. Battery charging is capped by surplus solar and remaining annual load; this is not an hourly dispatch or backup-runtime simulation.
Sources: https://www.energy.gov/cmei/systems/homeowners-guide-solar • https://pvwatts.nrel.gov/ • https://www.energy.gov/cmei/systems/solar-energy-guide-homebuilders