One roof.
A clearer plan.

Put the roof, solar and the numbers on the same page.

50 STATES + D.C.

Start with a working example. Replace every assumption with your measurements, utility terms and written quotes.

Explore incentive sources
Unsaved planning draft
Sign in to save
07 / BEFORE THE SITE VISIT

A better list of questions.

This review prepares the conversation with a roofer and solar installer. It does not approve the roof or diagnose its condition.

?

Roof life & condition

Record roof age, remaining service life, attachment details and who covers roof penetrations.

Bring to your site review
?

Shade & production

Request an hourly or annual shade assessment. Include trees, chimneys and seasonal shadows.

Bring to your site review
?

Direction & usable roof area

Have the installer model each usable roof plane, pitch, setbacks and obstructions. Direction alone does not establish suitability.

Bring to your site review
?

Structure & attachments

Have a qualified professional verify roof structure, attachment loads and local requirements. Save the review with your roof records.

Bring to your site review
?

Utility & electrical

Confirm the electrical-panel scope, interconnection process, export rate, fixed charges and permission to operate with the utility.

Bring to your site review

Permission & project coordination

Confirm ownership permissions, applicable HOA/local approvals, installer responsibilities and the roof/solar sequence.

Context recorded · professional confirmation still needed

Review topics informed by the U.S. Department of Energy homeowner guide and solar installation considerations.

REQUESTROOF • PLANNING BRIEF
My roof + energy plan
Location: 
Illustrative planning model. Replace assumptions with written quotes. No automatic incentive or ZIP-based price adjustment.

ROOF GEOMETRY
Input 1800 ft² (footprint); pitch 6/12. Surface 2012.5 ft²; materials 2254.0 ft² including 12% waste.
Roof materials: $3,381 – $6,762 — 2,254 ft² including 12% waste × material rate
Installation labor: $4,025 – $8,050 — 2,012 ft² roof surface × labor rate
Access & complexity: $0 — 0% of installation labor
Tear-off: $2,012 — 1 layer(s) × surface area × removal rate
Decking allowance: $0 — 0 ft² × decking rate; confirm damaged area onsite
Roof permit allowance: $400 — Your entered allowance
Disposal allowance: $400 — Your entered allowance
Contingency: $1,022 – $1,762 — 10% of modeled roof subtotal

ROOF ONLY
Roof installed package: $11,240 – $19,387
Gross: $11,240 – $19,387
Confirmed incentives: $0
Net after confirmed incentives: $11,240 – $19,387
Modeled first-year energy value after maintenance: $0
Payment assumption: cash

ROOF + SOLAR
Roof installed package: $11,240 – $19,387
Solar installed package: $15,000 – $24,000
Confirmed combined-work discount: -$0
Gross: $26,240 – $43,387
Confirmed incentives: $0
Net after confirmed incentives: $26,240 – $43,387
Modeled first-year energy value after maintenance: $554
Payment assumption: cash

ROOF + SOLAR + BATTERY
Roof installed package: $11,240 – $19,387
Solar installed package: $15,000 – $24,000
Battery installed package: $10,000 – $18,000
Confirmed combined-work discount: -$0
Gross: $36,240 – $61,387
Confirmed incentives: $0
Net after confirmed incentives: $36,240 – $61,387
Modeled first-year energy value after maintenance: $554
Payment assumption: cash

INCENTIVES
No incentives confirmed.
ENERGY ASSUMPTIONS
Generation 8000 kWh/year; household use 12000 kWh/year; direct self-use 40%; retail $0.16/kWh; export $0.04/kWh; solar maintenance $150/year. Battery charge 0 kWh/year, efficiency 90%, maintenance $0/year.
Loan model uses gross less cash deposit, not future incentives. Deposit $0; annual interest 7%; term 10 years. Fees, escalation, degradation, replacements and tax effects are not modeled.

SITE REVIEW CHECKLIST
□ Roof life & condition — Record roof age, remaining service life, attachment details and who covers roof penetrations.
□ Shade & production — Request an hourly or annual shade assessment. Include trees, chimneys and seasonal shadows.
□ Direction & usable roof area — Have the installer model each usable roof plane, pitch, setbacks and obstructions. Direction alone does not establish suitability.
□ Structure & attachments — Have a qualified professional verify roof structure, attachment loads and local requirements. Save the review with your roof records.
□ Utility & electrical — Confirm the electrical-panel scope, interconnection process, export rate, fixed charges and permission to operate with the utility.
□ Permission & project coordination — Confirm ownership permissions, applicable HOA/local approvals, installer responsibilities and the roof/solar sequence.

NOTES
None entered.

METHOD
Surface = footprint × √(1 + (rise/12)²), or entered surface area. Waste applies only to materials; complexity applies only to labor. Quote overrides replace their whole package. Annual energy value = onsite kWh × retail rate + export kWh × export rate − maintenance. Battery charging is capped by surplus solar and remaining annual load; this is not an hourly dispatch or backup-runtime simulation.