PROPERTY PLANNING / REQUESTROOF FIELD GUIDE

Give every property a roof record.

A repeatable way to organize a portfolio without turning an estimated roof age into a diagnosis.

01

Begin with a consistent inventory

For each property, record the address, known install date, covering, contractor and source of that information. Mark an age as an estimate when the supporting document is missing. Add separate roof areas when their histories differ.

Keep observations, professional assessments and completed work in separate dated entries. A photo is useful evidence of what was visible; it should not silently become a condition rating or a replacement order.

02

Build a schedule around evidence

List open issues, the next requested professional review and any documented maintenance instructions. Add the responsible person and an intended follow-up date so an observation has a clear next step.

Prioritize a confirmed active issue through an appropriate professional assessment. For longer-term planning, compare replacement scenarios and your chosen contingency. Keep a planning reserve distinct from a contractor quote, insurance payment or promised incentive.

03

Prepare for coordinated work and handover

If the roof project is part of a larger renovation, map the dependencies: assessments, approvals, roof work, solar, related electrical work and final records. HomeProjectOrder is a related tool for thinking through the wider sequence.

For occupied properties, document access and communication arrangements with the people involved. Confirm the local rules and contractual responsibilities that apply to the property. When management changes, hand over the supporting files and open questions along with the summary.

TAKE THIS TO YOUR NEXT CONVERSATION

Your next-step checklist.

  • Record the source of each install date and material entry.
  • Separate observations from professional assessments.
  • Assign a next action and follow-up date.
  • Use a scenario budget with visible assumptions.
  • Maintain a complete handover package for each address.
Open property workspace

Follow the source.

These links support the factual guidance above. Project requirements and program availability should be checked against the exact source and your local professionals.

FTC — Written project scope and agreementsGAF — Warranty terms to retainSource review: 2026-11-24. Editorial planning guidance is provided by RequestRoof.