Know what sits beneath the finish.
Understand the scope conversations around the deck, water details and attic.
Decking is a scope question
Ask the roofer what is known about the existing deck and what will be inspected after tear-off. Save the proposed repair allowance, the price for additional work and the approval process in one place.
If the contractor discovers a condition that changes the scope, ask for location-specific photographs and a written explanation. Record your decision before that change becomes a disputed invoice. An online image or estimate cannot establish the structural condition of a concealed assembly.
Ask about the transitions
Roof edges, valleys, walls, chimneys and other penetrations deserve named details in the proposal. Ask which flashings are replaced, which may be retained, and how the professional has assessed that choice.
For a project seeking a FORTIFIED designation, IBHS provides a system-specific checklist covering deck attachment, a sealed roof deck and other requirements. Arrange the required evaluator and documentation early if that designation is part of your goal. Do not assume a marketing phrase is the designation.
Treat the attic as part of the conversation
For a vented attic, ENERGY STAR explains that air sealing, insulation and unobstructed ventilation work together. Adding insulation must not block soffit airflow. This guidance does not mean every attic uses the same assembly.
Ask the professional to identify your attic design, moisture observations and proposed intake/exhaust arrangement. If an unvented assembly or major insulation change is proposed, request the applicable design and installation requirements rather than adding a generic vent package.
Your next-step checklist.
- Ask what can be inspected before and during tear-off.
- Write down included deck repairs and extra-work pricing.
- Identify flashing treatment at every relevant transition.
- Document the attic assembly and proposed ventilation work.
- Confirm independent evaluation if pursuing FORTIFIED.